Oak and Myrtle Water Main Replacement Project

The Work to be done under this Contract includes: excavation, traffic control, installing new waterline, installing hot taps, installing new water services and meters, installing new fire hydrant assemblies, asphalt saw cutting, trench patching, and additional and incidental work as called for by the Specification and Plans.
Bid Set - Drawings (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Myrtle & Oak - Plans - 100%_updated 2025 23.0 MB